03 / PMM Strategy
Automating PMM Intelligence @ Achievers
On the PMM team at Achievers, I identified a broken quarterly process — 8+ hours of manual NPS comment analysis producing inconsistent, stale insights — and built an AI text classification pipeline that cut the time to 30 minutes and surfaced feature gaps that went directly into the product backlog.
Company
Achievers
Role
Product Marketing Analyst (Co-op)
Year
Mar – Dec 2025
Tags

01 / Challenge
The Problem
Every quarter, someone manually read through 700–1000+ open-text NPS comments, grouped them into themes in a spreadsheet, and wrote up a summary. The process took 8 hours, produced inconsistent results depending on who did it, and delivered insights that were already stale by the time they reached the product team.
Protected Content
The full case study is available on request. Reach out to Newgen directly for access.
Get in touch